Recent Projects and News

What Abcas have been up to – from cliff stabilisation in Gibraltar to paint thickness testing

High level gutter clearance

Abcas technicians were quickly able to access the roof and clear out vegetation and debris from the gutters. Works were undertaken “out of hours” to minimise disruption to the client. Photo’s of the gutters were taken before and after to hand to the client as was a brief report on roof defects identified during the cleaning works.

Posted in   

Re-pointing brickwork on high-rise flats

Following an investigation into water ingress brickwork re-pointing was carried on this high rise block in Bristol

Posted in   

Paint thickness testing and remedials

Scaffolding had been removed from an area of high level pipework on this new energy centre site to allow access to others. Paint thickness testing and additional coating was required and roped access proved to be the most cost effective method.

Our technicians were able to access all areas required using a combination of techniques including aiding on the supporting structural steelwork.
The benefits of utilising rope access for this included the limited set up time and minimal disruption to other contractors working nearby.

The work was completed on schedule to the full satisfaction of the client.

Posted in   

Historic building works

Posted in   

Paint touch up of structural steel work

Posted in   

« Older