Tenby Cliff Stabilisation
Following a small landslip at this West Wales coastal town Abcas were engaged to undertake an inspection of the slope followed by remedial works to stabilise the area.
Abcas undertook:
- Removal of slipped material from the slope
- Installation of erosion control matting to encourage soil retention & vegetation regrowth
- Installation of cement grouted hollow bar soil nails
- Installation of rock fall protection netting and perimeter cabling
The works were completed within both programme and budget.